Product Description
Introduction of Good service Diesel Mining Explosion-Proof Underground Electric Railway Shunting Locomotive
CCG Mining Explosion-proof Diesel Locomotives is a kind of driven, the vehicle with proof performance for containing flammable gas and coal dust and other dangerous places, traction, transport of mining locomotives, traction battery and then following the hydraulic transmission of a utility model traction. Mine explosion-proof drum & rail locomotive diesel engine series, is in line with the ideal of coal mine production safety transportation equipment. It is reasonable structure, compact, energy saving, high efficiency, easy operation and maintenance, frame lines motor vehicle, motorcycle batteries, compared does not need to set up traction power, do not need AC power and charging equipment.zmwm15
Advantages of Good service Diesel Mining Explosion-Proof Underground Electric Railway Shunting Locomotive
1.Double-ended locomotive driving, easy operation and passengers, and better outlook;
2.Body short, maintaining roadway turning radius by the flexibility and stability;
3.Electric starter, control rooms for sound processing, noise reduction;
4.By (European) import the essence of device, the second exhaust gas treatment, to further reduce emissions.
Parameters of Good service Diesel Mining Explosion-Proof Underground Electric Railway Shunting Locomotive
Model (basic
parameter)
Item |
CCG 3.0/600J (B) |
CCG 5.0/600J (B) |
CCG8.0/600J |
Matched Power Model |
ZS1115FB |
YH1125SFB |
YH4108DFB(A) |
Dimension (L*W*H) mm |
2400*920(1000)*1600 |
3020*1000(1098)*1600 |
3700*1100*1600 |
Weight kg |
3000 |
5000 |
8000 |
Greatest Traction |
4.5 |
7.5 |
12 |
Force KN |
Pulling Tonnage T |
15 |
22 |
35 |
Gauge mm |
600/762/900(made to order) |
Wheelbase mm |
706(712) |
880(860) |
980 |
Greatest Speed km/h |
15+1 |
17+1 |
20+2 |
Diesel Engine Power (kw)/Rotating Speed (r/min) |
11/2200 |
14.7/2200 |
52/2400 |
Smallest Railway Orbit m |
5 |
6 |
7 |
Greatest Braking Force N |
5000 |
8000 |
12800 |
Traction Height mm |
270 320 |
320 430 |
320 430 |
Braking Distance m |
40 |
Height Above Ground mm |
80 |
125 |
125 |
Braking Mode |
foot and machine control |
air and hand wheel control |
Exhaust Quality |
CO≤0.1% NOX≤0.08% |
Photos of Hot Sale Diesel Mining Explosion-proof Diesel Locomotives Underground Electric Railway Shunting Locomotive
Company Profile
1.Q: Are you a manufacturer or a trader?
A: We are a professional manufacturer with our own research and development team and sales team, providing one-stop services.
2.Q: What is your delivery time?
A: Usually, we conduct inventory of goods. If we have inventory of products, the delivery time is 5-10 days after receiving the
deposit. If we do not have inventory of products, we will immediately arrange production with a delivery time of 30-45 days,
depending on the order quantity.
3.Q: Do you provide OEM/ODM services?
A: Yes, please provide me with the necessary information. We provide customized services to meet the different needs of global customers with different budgets.
4.Q: Do you have a CE certificate?
A: Yes, most of our products have CE certificates.
5.Q: How do we ensure quality?
A: The final inspection is always carried out before shipment.
6.Q: How to install the device after purchase?
A: We will provide professional installation videos for explanation. Provide a manual at the same time.
7.Q: Do you provide a guarantee?
A: Yes, our product has a one-year warranty. Provide after-sales service support and technical support.
8.Q: What is your minimum order quantity?
A: 1 set.